The U.S. Department of Housing and Urban Development (HUD) guidelines on lead hazard control instructs contractors to clean floors, windows, walls, ceilings, and other horizontal surfaces to remove lead-contaminated dust and debris after lead interventions are conducted. This dust removal activity adds costs to each project. The need to clean floors and windows is well documented in the HUD guidelines. However, there is substantially less documentation to support the recommendation to clean walls and ceilings. We examined whether it is necessary to clean walls and ceilings after lead hazard control (LHC) interventions by comparing dust lead loadings measured on these surfaces before an LHC intervention to dust lead loadings after the intervention. Twenty-two dwelling units undergoing substantial LHC measures consistent with the HUD guidelines were enrolled in the study. There was a significant increase in dust lead loading on walls and ceilings between the pre- and post-intervention. The change in wall dust lead loading was substantial and created potentially harmful lead exposures.Although statistically significant,the change in ceiling dust lead loading was minimal and the post-intervention dust lead loadings were far below the existing federal floor dust lead clearance standard. These results strongly support the recommendations in the HUD guidelines to clean walls after LHC interventions and donot provide sufficient justification to alter the current recommendation to clean ceilings after leadwork. Key words: lead dust, lead hazards, lead paint, lead poisoning, wall and ceiling dust lead.Environ Health Perspect108:453–456 (2000).[Online 30 March 2000]http://ehpnet1.niehs.nih.gov/docs/2000/108p453-456tohn/abstract.html Reproduced with permission from Environmental Health Perspectives
December 12th, 2017